Search | Add a publication |
ID No : | 907 Edit | Title: | The Habitat Demonstration Unit Project Overview |
Summary / Review : | "This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process." (Author's abstract) |
Author(s) : |
Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S., [Jet Propulsion Laboratory; Johnson Space Center; Kennedy Space Center] |
Publication Date: | 2010 |
Category(s) : |
Life / Habitats and biospherics |
Web URL : |
http://hdl.handle.net/2060/20100003414
If this link is broken, please Add Comment below. We try to keep author contact details, and a backup copy in our offline library. |
PERMANENT code(s) : | L,U |
(Explanation of the last 3 rows above) |
In the row above, there are up to 4 possibilities: U = URL you can click on to get a copy instantly from another source on the internet, or request it from that source D = Downloadable from PERMANENT (such as because no other URL known...) L = LAN copy, PERMANENT has a digital copy but not downloadable from our website P = Paper copy in the PERMANENT office Typically, only 0 to 3 methods are available. |
NTRS : | 20100003414 |
Other Ref # : | JSC-CN-19340 |
Submitted by : | MEP |
Comments: |
Please add your thoughtful Comments to this paper after reading it. All comments are reviewed and approved before being posted publicly below. If you wish to submit a private comment to the curator, instead of a public comment, just write "Private" at the start of your comment. Corrections and suggested additions to our records are appreciated. |
Add Comment |