Title: Planning and Estimation of Operations Support Requirements
Summary / Review : "Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates." (Author's abstract)
Author(s) : Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon, [Marshall Space Flight Center]
Publication Date: 2010
Category(s) : Missions / Zz uncategorized
Progress Type: T ( A=Analysis only, D=Design, T=Testing, C=Completed or Commercial product )
Web URL : http://hdl.handle.net/2060/20110006923
If this link is broken, please Add Comment below.
We try to keep author contact details, and a backup copy in our offline library.
PERMANENT code(s) : L,U
(Explanation of the
last 3 rows above)
In the row above, there are up to 4 possibilities:
U = URL you can click on to get a copy instantly from another source on the internet, or request it from that source
D = Downloadable from PERMANENT (such as because no other URL known...)
L = LAN copy, PERMANENT has a digital copy but not downloadable from our website
P = Paper copy in the PERMANENT office
Typically, only 0 to 3 methods are available.
NTRS : 20110006923
Other Ref # : M10-0597, M09-0686, M10-0396
Submitted by : MEP
Comments: Please add your thoughtful Comments to this paper after reading it.
All comments are reviewed and approved before being posted publicly below.
If you wish to submit a private comment to the curator, instead of a public comment, just write "Private" at the start of your comment.
Corrections and suggested additions to our records are appreciated.
  Add Comment 
Add Comment     Green is public,     Pink is private.
Screen Name: Either real name or anonymous alias are OK.
Real Name and
optional info:

Please provide at least your real name, and optionally additional information.
Email Address: We keep your email address private.
Date - Time Sorry, just click on the field, then on the popup calendar click "Now" then "Done".
Your Comment: (if private to curator, then just start with "Private:" or something like that.)